The Manual -
This page contains the links that make up the manual for all of the
steps required to build the Super2. The manual is divided into Chapters
and most chapters have different sections. This organization allow you
to locate the drawings associated with each task. The entries in blue
have been completed and are active links, the entries in black are under
construction.
Chapter 1 - Introduction
Chapter 2 - Fabricating the Tail
Section 1 - Horizonal Stabilizer
Section 2 - Vertical Stabalizer
Chapter 3 - Fuselage
Section 1- Forward Fuselage
Section 2 - Rear Fuselage
Section 3 - Joining the Halves
Section 4 - Fuselage Features
Chapter 4 - Installing theTail
Section 1 - Bonding Tail to the Fuselage
Section 2 - Elevator
Section 3 - Rudder
Chapter 5 - Gullwing Canopy
Section 1- Canopy Outer Skin
Section 2 - Canopy Foam
Section 3 - Finishing Canopy
- Fabricating Bulb Seal Flange
- Fabricating Plexiglas Flange
- Installing Canopy to Fuselage
- Installing Plexiglass
Chapter 6 - Turtle Deck
Chapter 7 - Wing
Section 1 - Spars
Section 2 - Ribs
Section 3 - Wing Assembly and bottom Skin
Section 4 - Wing Internals
- Parts Required and Wing Prep
- Flanges
- Access Panels
- Fuel Cell Components
- Idler and Bellcrank Assemblies
- Aileron Control Tubes
- Wiring and Hydraulics
- Flap Hinges
- Gear Leg Mounting
- Tie Down
Section 5 - Wing Top Skin
Chapter 8 - Wing to Fuselage
Chapter 9 - Engine
Section 1 - Corvair Modifications
Chapter 10 - Firewall forward
Section 1 - Fuel system
Section 2 - Oil System
Section 3 - Electrical
Chapter 11 - Electrical
|