Home

Downloads

Links

Contact

Disclaimer

The Manual -

This page contains the links that make up the manual for all of the steps required to build the Super2. The manual is divided into Chapters and most chapters have different sections. This organization allow you to locate the drawings associated with each task. The entries in blue have been completed and are active links, the entries in black are under construction.

Chapter 1 - Introduction

 

Chapter 2 - Fabricating the Tail

Section 1 - Horizonal Stabilizer

Section 2 - Vertical Stabalizer

 

Chapter 3 - Fuselage

Section 1- Forward Fuselage

Section 2 - Rear Fuselage

Section 3 - Joining the Halves

Section 4 - Fuselage Features

Chapter 4 - Installing theTail

Section 1 - Bonding Tail to the Fuselage

Section 2 - Elevator

Section 3 - Rudder

 

Chapter 5 - Gullwing Canopy

Section 1- Canopy Outer Skin

Section 2 - Canopy Foam

Section 3 - Finishing Canopy

  • Fabricating Bulb Seal Flange
  • Fabricating Plexiglas Flange
  • Installing Canopy to Fuselage
  • Installing Plexiglass

Chapter 6 - Turtle Deck

Chapter 7 - Wing

Section 1 - Spars

Section 2 - Ribs

Section 3 - Wing Assembly and bottom Skin

Section 4 - Wing Internals

  • Parts Required and Wing Prep
  • Flanges
  • Access Panels
  • Fuel Cell Components
  • Idler and Bellcrank Assemblies
  • Aileron Control Tubes
  • Wiring and Hydraulics
  • Flap Hinges
  • Gear Leg Mounting
  • Tie Down

Section 5 - Wing Top Skin

Chapter 8 - Wing to Fuselage

Chapter 9 - Engine

Section 1 - Corvair Modifications

Chapter 10 - Firewall forward

Section 1 - Fuel system

Section 2 - Oil System

Section 3 - Electrical

Chapter 11 - Electrical